W.P. Hickman Company - The Leading Edge® since 1945. Perimeter edge metal for commercial roofs. Coping, gravel stops, roof edging, gutters, downspouts, reglets and trims.

PressRoom.  


Subscribe Subscribe to RSS feed

   W.P. Hickman Company Product Details Now Available in BIM Format

(02/22/2010) The W.P. Hickman Company announces the immediate availability of online BIM content for its full line of metal commercial roof edge products.


   W. P. Hickman - 2009 North Carolina Small Business of the Year Runner-Up

(12/15/2009) The W. P. Hickman Company has been selected as Runner-Up in Business North Carolina magazine's Small Business of the Year competition.


   W. P. Hickman Co. Implements Installation and Field Measuring Hotline

(11/03/2009) The W. P. Hickman Company has announced an Installation and Field Measurement Hotline that will commence November 3, 2009. The service will be provided free of charge to anyone installing or measuring roofs with W. P. Hickman Company products. The hotline will be available from 6:30am-4:30pm (EST), Monday through Friday, with the exception of holidays. The phone number to the hotline is 800.892.9173, extension 222.


   W. P. Hickman Co. Employee receives Florida Professional Engineer Certification

(09/30/2009) Dr. Robert Steffen, Director of Engineering for the W. P. Hickman Company has expanded his Professional Engineer licensure to include the state of Florida. Steffen already holds Professional Engineer licenses in North Carolina, California, and Maryland.


   W. P. Hickman Company grows new product line, EcoEdge for Vegetative Roof Systems

(05/14/2009) The W.P. Hickman Company has responded to the growing popularity of vegetative roof systems by developing essential metal components engineered to help with drainage and retention of soil and growth medium.


   W. P. Hickman Company offers ANSI/SPRI ES-1 Tested Continuous Cleat Coping System

(04/09/2009) The coping system features a continuous 20ga, anchor cleat on the parapet face.


   W. P. Hickman Company Launches Quick Ship TerminEdge Program, Shipping Fascia System in 48 Hours

(03/13/2009) The Quick Ship TerminEdge Program provides a speedy option for roofing contractors, in an industry that is driven by time constraints.


   W.P.Hickman Company Includes Non-Corrosive, Stainless Steel Fasteners Standard with all Edge Metal Systems

(04/16/2008) W.P. Hickman Company announces that stainless steel fasteners are being provided as a standard component with all its perimeter edge metal systems at no additional charge to customers.


   W.P.Hickman Company Addresses Katrina Issues with New Web Based Tools

(02/11/2008) Hickman’s web site now provides the building community with a new suite of tools and resources facilitating the design and installation of commercial roof edge systems.


   Steffen Joins W.P. Hickman as Director of Engineering

(01/02/2008) Dr. Robert Steffen has joined the W.P. Hickman Company as Director of Engineering.


   W. P. Hickman Roof Edge Products Granted Miami-Dade County Approval

(10/23/2007) W.P. Hickman has received its Notice of Acceptance (NOA) from the Building Code Compliance Office in Miami-Dade County.


   W.P. Hickman Reduces Lead Times

(09/04/2007) W.P. Hickman significantly reduces lead times for architectural edge metal.


   W.P. Hickman Company Offers the Construction Industry's First ANSI/SPRI ES-1 Certificate of Compliance

(08/17/2006) W.P. Hickman Company proudly offers the industry's first and only ANSI/SPRI ES-1 Certificate of Compliance for all of its qualified products.


   W. P. Hickman Company First to Receive ES-1 Based Underwriters Laboratories Classification for Roof Edge Systems

(08/16/2006) The W. P. Hickman Company has received the Underwriters Laboratories (UL) Classification for roof edge systems, following a complete review of the company's design and manufacturing practices.


   W.P. Hickman Expands Extruded TerminEdge Product Line

(04/15/2006) The extruded retainer bar is now available in two new sizes: 5.25" and 6.75".


   Roofing Technology: ON THE EDGE

(09/07/2005) Roof edges can be a major locus of failure in low-slope metal roofs. Our experts offer 12 design tips to ensure that you're covered-all the way to the edge.


   W.P. Hickman Company Products Meet ES-1/International Building Code Requirements

(06/22/2005) W.P. Hickman Company products are certified to meet ES-1 requirements, now a part of the 2003 International Building Code.


   W.P. Hickman Company Introduces Extruded TerminEdge Fascia System for Built-up and Modified Bitumen Roofing

(03/15/2005) The unique features of this new product include a three-part system for low profile roof edges specified for built-up and modified bitumen roofing.


   Redesigned Safeguard NP Fascia System Offers Improved Wind Resistance Performance

(02/15/2005) W.P. Hickman's Safeguard NP (non penetrating) fascia system has been redesigned to meet even higher wind resistance than the original Safeguard NP.


   Introducing Extruded TerminEdge Fascia System

(05/06/2004) W.P. Hickman Company's new Extruded TerminEdge fascia system complements our popular, time-tested TerminEdge product.


   Florida Product Approval

(05/02/2004) W.P. Hickman Company first to receive Florida product approval for perimeter roof edge metals.


Customer Testimonials




IBC / ES-1 Compliant, FM Approved, UL Classified, Cat 5 ProtectionType here to search WPH:    [Contact Us]  [Find a Rep]  [call us at 800.892.9173]